Vertex Reduces EDC Study
Build Times by 50%

First study build
completed 40% faster

Delivered second, more complicated study 50% faster

Reduced review
cycles and UAT

Vertex shares the experience of their first two studies using Vault EDC and the UAT process innovations that dramatically reduced database build times.